EMP is designed to seek and destroy Lm.
The EMP team conducts a robust risk assessment that will lead to the determination of the sampling locations, timing and frequency of samplings.
The assessment should include (at a minimum): plant layout, equipment, processes, GMP implementation etc.
Baseline swabbing is utilized as a tool in the risk evaluation process.